History Experiences Services

CONSULTING AND CONSTRUCTION
Level of Responsibilities (LR) and Type of Conclusions (TC)
Project LR TC Methods & Regulations
Phase I director and contractor level phase IIrequirement
Recommend repair, removal, and hazardous material management or no further action.
recconaicent city/county/fire Dept. records
search historical tenant report
search environ govern. records
Phase II director and contractor level additional soil boring
groundwater investigation
Chemical analytical parameters remediation or no further action
sample analysis results
soil lithologic study
groundwater study
lead agencies rules
California State title 22
Cal-RWQCB's rules
Phase III (soil/groundwater) project manager and contractor On-Site remedial actions
groundwater monitoring confirmative sampling
no further action
sample analysis results
soil lithologic study
groundwater study
lead agencies rules
California State title 22
Cal-RWQCB's rules
UST Removal director and contractor on-site abandonment
off-site removal
grab soil sampling
soil boring
groundwater sampling
soil/groundwater remediation
sample analysis results
soil vapor reading by OVA
lead agencies' rules
California State title 22 & 23
UST Installation Director & Contractor leak monitoring program (LMP)
leak detection system (LDS)
California State Title 23
SCAQMD Rules
CARB Regulations
UBC Electrical-Haz. Division II
Uniform Fire Codes
Gas Station Contractor new gas station design, permitting, andconstruction UBC construction codesenvironmental related codes
Building Contractor commercial & residential buildingsConstruction or remodeling UBC construction codes
city guidelines

History Experiences Services

 

   
Copyright © 2002 Environ Phase Consulting Co. All rights reserved.
Contact: jlee@gotoepc.com.    Tel:(213) 738-6003.   Fax:(213) 738-6009