Level of Responsibilities (LR) and Type of Conclusions (TC)
|
Project |
LR |
TC |
Methods & Regulations |
Phase I |
director and contractor level |
phase IIrequirement
Recommend repair, removal, and hazardous material management
or no further action. |
recconaicent city/county/fire Dept. records
search historical tenant report
search environ govern. records |
Phase II |
director and contractor level |
additional soil boring
groundwater investigation
Chemical analytical parameters remediation or no further action |
sample analysis results
soil lithologic study
groundwater study
lead agencies rules
California State title 22
Cal-RWQCB's rules |
Phase III (soil/groundwater) |
project manager and contractor |
On-Site remedial actions
groundwater monitoring confirmative sampling
no further action |
sample analysis results
soil lithologic study
groundwater study
lead agencies rules
California State title 22
Cal-RWQCB's rules |
UST Removal |
director and contractor |
on-site abandonment
off-site removal
grab soil sampling
soil boring
groundwater sampling
soil/groundwater remediation |
sample analysis results
soil vapor reading by OVA
lead agencies' rules
California State title 22 & 23 |
UST Installation |
Director & Contractor |
leak monitoring program (LMP)
leak detection system (LDS) |
California State Title 23
SCAQMD Rules
CARB Regulations
UBC Electrical-Haz. Division II
Uniform Fire Codes |
Gas Station |
Contractor |
new gas station design, permitting, andconstruction |
UBC construction codesenvironmental related codes |
Building |
Contractor |
commercial & residential buildingsConstruction
or remodeling |
UBC construction codes
city guidelines |